Vai direttamente al contenuto della pagina.
English
  • Italiano flag Italiano
  • English flag English
  • Español flag Español
  • Trevi Group
  • Main Project News
  • Careers
  • Suppliers
  • Accessibility Statement
Whistleblowing/Segnalazioni
  • Italiano Italiano
    • IT – Policy del Gruppo Trevi
    • IT – Procedura operativa
    • IT – Segnalazioni tramite Lettera/Email
    • Whistleblowing
  • English English
    • EN – Trevi Group Policy
    • EN – Operating Procedure
    • EN – Reporting by Letter/Email
    • Whistleblowing
  • Espanol Espanol
    • ES – Politica del Grupo Policy
    • ES – Procedimiento Operativo
    • ES – Informes por Carta/Correo
    • Whistleblowing
Trevi SpA (EN)
  • Expertise
  • Sustainability
  • Services
  • Technologies
  • Projects
    • Main Projects
    • Projects Archive
    • EU-Funded Projects
  • Media
  • Company
    • Headquarters
    • Trevi Algerie
    • Trevi Australia
    • Trevi Philippines
    • Trevi Foundations Kuwait
    • Trevi Foundations Nigeria
    • Pilotes Trevi
    • Trevi Cimentaciones Mexico
    • Trevi Turkey
    • Trevi France
  • Contact us
    • Contact us
    • Network
    • FTA Academy
  • Trevi Group
  • Main Project News
  • Careers
  • Suppliers
  • Accessibility Statement

Press enter to search or escape to exit

Home / Media Gallery / COPENHAGEN CITYRINGEN METRO LINE PROJECT
Submenu
  • Arena Santa Giulia
  • Arena Santa Giulia - Teaser
  • TREVI for Caviro in a new bottling wine facility
  • HS BRESCIA VERONA - THE LONATO GALLERY - MASTERING THE TASK
  • CHACAO BRIDGE PROJECT - PILA SUR - MASTERING THE TASK
  • CHACAO BRIDGE PROJECT - PILA NORTE - MASTERING THE TASK
  • OUR METRO & MRT - Emblematic structures built by Trevi Group
  • OUR DAMS - Emblematic structures built by Trevi Group
  • E-JET - Putting the jet grouting into elliptical shape
  • SKYWAY STAGE 3 - TREVI FOUNDATIONS PHILIPPINES
  • OUR BRIDGE - Emblematic structures built by Trevi Group
  • GRAND PARIS EXPRESS - MASTERING THE TASK
  • WORKING ACTIVITIES FOR ROME METRO C LINE - MASTERING THE TASK
  • CHACAO BRIDGE PROJECT - PILA CENTRAL - MASTERING THE TASK
  • FOUR FRANKFURT - MASTERING THE TASK
  • FOUR FRANKFURT - FEEL THE EMOTIONS
  • CEBU - CORDOVA LINK EXPRESSWAY PROJECT: MASTERING THE TASK
  • LIQUEFACTION A TREVI TEST FIELD IN PIEVE DI CENTO
  • MAINTENANCE GROUTING AND REHABILITATION OF THE BOTTOM OUTLET TUNNELS
  • 60 YEARS OF THE TREVI GROUP
  • RESTORATION OF LUNGARNO TORRIGIANI EMBANKMENT
  • ROME METRO LINE C PROJECT
  • NEW EASTERN DOCK PROJECT AT PORT OF NAPLES
  • MANFREDONIA LANDFILL CLEANUP AND RECLAMATION
  • DEEP SOIL MIXING HELPS RESTORE SAN MARCO BELL TOWER IN VENICE
  • HYDROMILL TECHNOLOGY FOR THE NEW MILLENNIUM
  • ARCISATE-STABIO RAILWAY PROJECT
  • STANS H-3 TUNNEL (AUSTRIA)
  • NEW ORLEANS EAST BACK LEVEE LPV-111 IMPROVEMENT

COPENHAGEN CITYRINGEN METRO LINE PROJECT

Copenhagen residents have witnessed a large fleet of Soilmec drill rigs, cranes and hydromills wedged in between residences and historic buildings throughout the heart of the city. As shown in the video, the equipment played a critical role in the construction of the new metro line. The Cityringen is the new underground line that will link the whole of the centre of Copenhagen and Frederiksberg. Once the work is completed, there will be 17 stations, alla underground, 4 service shafts, a command centre and a train depot; the total length of the line is about 15 kilometres. Once again on this project, Trevi has maintained high quality control standards, establishing an excellent relationship of trust with both the client and the main contractor.

The Cityringen is the new underground line that will link the whole of the centre of Copenhagen and Frederiksberg.

Once the work is completed, there will be 17 stations, alla underground, 4 service shafts, a command centre and a train depot; the total length of the line is about 15 kilometres.

Once again on this project, Trevi has maintained high quality control standards, establishing an excellent relationship of trust with both the client and the main contractor.

Follow Us
    • twitter
    • issuu
  • Expertise
  • Technologies
  • Services
  • News
  • Events
  • Press Review
  • About us
  • Controls & Risks
  • Contact us
  • Network
  • Careers
  • FTA – Academy
© TREVI - Finanziaria Industriale SpA - P.IVA: 00002890408
  • Cookie Policy
  • Privacy Policy
  • Sitemap
  • Accessibility Statement