Metro Manila Skyway: technical complexity


The Manila Skyway Stage 3 has been one of the largest and most prominent project in the last few years in Philippines, from a technical point of view as well as logistical.   

Technical, because the largest diameter of the piles implemented by Trevi Philippines was 3500 mm with an average depth of 40 linear meters. Suffice it to say that it took 400 cubic meters of concrete to cast a single pile.  

With its 45,153 meters of perforations, steel reinforcements installation with total weight of 44,315,764 KG and casted 255,160 cubic meters of concrete it is one of the largest projects ever carried out by Trevi Philippines. 

}