Vai direttamente al contenuto della pagina.
English
  • Italiano
  • English
  • Español
  • Trevi Group
  • Main Project News
  • Careers
  • Suppliers
  • Accessibility Statement
Whistleblowing/Segnalazioni
  • Italiano Italiano
    • IT – Policy del Gruppo Trevi
    • IT – Procedura operativa
    • IT – Segnalazioni tramite Lettera/Email
    • Whistleblowing
  • English English
    • EN – Trevi Group Policy
    • EN – Operating Procedure
    • EN – Reporting by Letter/Email
    • Whistleblowing
  • Espanol Espanol
    • ES – Politica del Grupo Policy
    • ES – Procedimiento Operativo
    • ES – Informes por Carta/Correo
    • Whistleblowing
Trevi SpA (EN)
  • Expertise
  • Sustainability
  • Services
  • Technologies
  • Projects
    • Main Projects
    • Projects Archive
    • EU-Funded Projects
  • Media
  • Company
    • Headquarters
    • Trevi Algerie
    • Trevi Australia
    • Trevi Foundations Kuwait
    • Trevi Foundations Nigeria
    • Trevi Philippines
    • Pilotes Trevi
    • Trevi Turkey
  • Contact us
    • Contact us
    • Network
    • FTA Academy
  • Trevi Group
  • Main Project News
  • Careers
  • Suppliers
  • Accessibility Statement

Press enter to search or escape to exit

Home / Media Gallery / CHACAO BRIDGE PROJECT – PILA CENTRAL – MASTERING THE TASK
Submenu
  • Arena Santa Giulia
  • Arena Santa Giulia - Teaser
  • TREVI for Caviro in a new bottling wine facility
  • HS BRESCIA VERONA - THE LONATO GALLERY - MASTERING THE TASK
  • CHACAO BRIDGE PROJECT - PILA SUR - MASTERING THE TASK
  • CHACAO BRIDGE PROJECT - PILA NORTE - MASTERING THE TASK
  • OUR METRO & MRT - Emblematic structures built by Trevi Group
  • OUR DAMS - Emblematic structures built by Trevi Group
  • E-JET - Putting the jet grouting into elliptical shape
  • SKYWAY STAGE 3 - TREVI FOUNDATIONS PHILIPPINES
  • OUR BRIDGE - Emblematic structures built by Trevi Group
  • GRAND PARIS EXPRESS - MASTERING THE TASK
  • WORKING ACTIVITIES FOR ROME METRO C LINE - MASTERING THE TASK
  • FOUR FRANKFURT - MASTERING THE TASK
  • FOUR FRANKFURT - FEEL THE EMOTIONS
  • CEBU - CORDOVA LINK EXPRESSWAY PROJECT: MASTERING THE TASK
  • LIQUEFACTION A TREVI TEST FIELD IN PIEVE DI CENTO
  • MAINTENANCE GROUTING AND REHABILITATION OF THE BOTTOM OUTLET TUNNELS
  • 60 YEARS OF THE TREVI GROUP
  • RESTORATION OF LUNGARNO TORRIGIANI EMBANKMENT
  • ROME METRO LINE C PROJECT
  • NEW EASTERN DOCK PROJECT AT PORT OF NAPLES
  • COPENHAGEN CITYRINGEN METRO LINE PROJECT
  • MANFREDONIA LANDFILL CLEANUP AND RECLAMATION
  • DEEP SOIL MIXING HELPS RESTORE SAN MARCO BELL TOWER IN VENICE
  • HYDROMILL TECHNOLOGY FOR THE NEW MILLENNIUM
  • ARCISATE-STABIO RAILWAY PROJECT
  • STANS H-3 TUNNEL (AUSTRIA)
  • NEW ORLEANS EAST BACK LEVEE LPV-111 IMPROVEMENT

CHACAO BRIDGE PROJECT – PILA CENTRAL – MASTERING THE TASK

The construction of the Chacao Bridge aims at connecting the continent with the Chiloé Island, located 1.100 km south of Santiago de Chile, in the Los Lagos Region, 48 km away from Puerto Montt and only 5 km away from Pargua. Once the project is completed, there will be no interruption between the continent and the Chiloé Island. The country will be permanently connected from Arica in the North of Chile to Quellón in the Chiloé Island, through Route 5, which will be extended for 190 kilometres.
The bridge will cut the time required to cross the channel to just 3 minutes: this is a major improvement considering the actual trip time of about 30 to 45 minutes that the ferry takes to cross the channel, without taking into account the extreme weather conditions the channel faces throughout the seasons.
The length of the bridge will be 2,574 m and will consists of three main pylons, one in the middle of the channel and two on each side, namely the North Pylon on the continent side and the South Pylon on the Chiloé’s side. The lights between the Central and North Pylons will stretch for 1,553 m , while the ones between the Central and South Pylons will cover a 1,055m length, thus becoming the longest suspension bridge in South America.

The company TREVI CHILE SPA was selected by the consortium to carry out the foundations of the bridge piles; namely, the Central Pylon – already finished -, and the North and South Pylons that are currently being built.

The foundation works of the central pylon consisted in the execution of 36 piles with 2.5 m wide diameters and lengths of 54 m for type 1 piles and 58 m for types 2 and 3 approximately, each of them excavated from a Jack Up barge.

Follow Us
  • x
  • issuu
  • Expertise
  • Technologies
  • Services
  • News
  • Events
  • Press Review
  • About us
  • Controls & Risks
  • Contact us
  • Network
  • Careers
  • FTA – Academy
© TREVI - Finanziaria Industriale SpA - P.IVA: 00002890408
  • Cookie Policy
  • Privacy Policy
  • Sitemap
  • Accessibility Statement